| for the power production of the wind park – which is not higher than the calculated virtual power of the park (the theoretical maximum production of the park under the current conditions – calculated as function of each individual turbines conditions). From the control center of the wind park the wanted production is communicated to each individual turbine.
Depending on the pitch regulation of the turbine the turbine will need some time to comply with the new turbine set-point. In reality that means that a wind farm of for instance 50 turbines 1.5MW each will regulate from for instance 75MW to 50MW in approximately 60 seconds.
|
|

An example of the regulation of an wind park. Red is the maximum possible production of the park. Blue is the set-point send from the grid operator. Orange is the actual production. The park owner will not get rewarded for producing more than the, by the grid operator, requested limit. Complying with the limit minimises the wear of the wind turbines. |